≈100 yd³
Excavation
≈300 yd³
Retaining Walls
10 in reinforced
Slab
20 in thick
Rebar mat for the 20-inch court slab, retaining walls in place — Lombard Street Basketball Court Foundation, San Francisco, CA
Overview

New Edge Concrete built the foundation for a custom basketball court at a luxury hillside estate in the Lombard Street area of San Francisco. We cut into the hillside for 10-inch reinforced concrete retaining walls and a 20-inch-thick structural slab with a full perimeter drainage system — roughly 100 yards of concrete, finished smooth and ready to be painted as the final court. Access was extremely tight: we excavated about 300 cubic yards of soil and built temporary ramps over the existing stairs to move equipment and materials safely, protecting the estate's flagstone, landscaping, and artificial turf throughout. Start to finish, about six to seven weeks.

Scope of work

  • Hillside excavation & tight-access logistics
  • 10-inch reinforced retaining walls
  • 20-inch structural slab
  • Perimeter drainage system
  • Paint-ready court finish
  • Protecting flagstone, turf & landscaping